top of page

#autoDiscountTitleText

🎟 Voucher available

Product Description

The USB A to Type C Braided Cable is designed for fast and reliable charging and data transfer. With a 100W power rating and support for 6A fast charging, this cable ensures your devices are charged quickly and efficiently. Its durable braided design provides extra strength and resistance to wear, making it perfect for everyday use. Available in multiple lengths (0.25M, 1M, 2M, and 3M), it suits all your charging needs, whether at home, in the office, or on the go.

 

Key Features

✅ 6A Fast Charging – Supports up to 100W power output for rapid charging.
✅ USB A to Type C – Compatible with a wide range of devices, including smartphones, tablets, laptops, and more.
✅ Braided Design – Durable and tangle-free, built to last longer than standard cables.
✅ Multiple Lengths – Choose from 0.25M, 1M, 2M, or 3M to suit your setup.
✅ Fast Data Transfer – High-speed data transmission for quick file transfers.
✅ Universal Compatibility – Works with all Type-C devices, including Samsung, Huawei, Google Pixel, and other USB-C-enabled gadgets.

 

Specifications

  • Cable Type: USB A to Type C
  • Power Output: 100W (Max)
  • Current: 6A Fast Charging
  • Material: Braided nylon for durability
  • Length Options:
    • 0.25M – Ideal for portable charging.
    • 1M – Perfect for everyday use.
    • 2M – Great for extended reach.
    • 3M – Excellent for flexible setups.
  • Data Transfer Speed: Up to 480Mbps

 

Why Choose This Cable?

The USB A to Type C Cable is your all-in-one solution for fast charging, durability, and flexibility. Whether you need a short cable for a power bank or a long lead for home or office use, this cable offers unparalleled convenience and performance.

 

Package Includes

  • USB A to Type C Braided Cable (selected length: 0.25M, 1M, 2M, or 3M)

💥 Upgrade Your Charging Experience – Order Now! 💥

USB A to Type C Cable – 6A 100W Fast Charger multiple lengths (1M, 2M, 3M)

SKU: 186731505782E
15,99 £Cena

Free Shipping for All Orders

Fast Shipping Available

30-Day Money-Back Guarantee

Free Returns

Secure Checkout

SSL Secured

Norton Secured

McAfee Secure

BBB Accredited Business

100% Safe Payments

Data Protection Guaranteed

GDPR Compliant

PCI DSS Compliant

Authorized Reseller

SiteLock Secure

24/7 Customer Support

Privacy Protected

TRUSTe Certified Privacy

100% Virus-Free

No Hidden Fees

Customer Satisfaction Guaranteed

Quality Assurance Guaranteed

Eco-Friendly Products

Made in USA

Handmade with Care

Cruelty-Free Products

Fair Trade Certified

100% Organic

ISO Certified Quality

Expertly Trained Staff

Family Owned Business

Award-Winning Service

Ethically Sourced Materials

100% Satisfaction Guaranteed

Pet Friendly Products

Made from Recycled Materials

Carbon Neutral Company

Non-GMO Products

Lifetime Warranty

Trusted Site

Price Match Guarantee

Limited Time Offer

In-Stock Guarantee

Exclusive Products

Bundle Deals

New Arrival

Seasonal Sale

Skilled Workers

Top-Tier Equipment

Extensive Knowledge

Licensed & Insured

Množství
Visa
Visa
Mastercard
Mastercard
American Express
American Express
Discover
Discover
JCB
JCB
Diners Club
Diners Club
UnionPay
UnionPay
PayPal
PayPal
Apple Pay
Apple Pay
Google Pay
Google Pay
Amazon Pay
Amazon Pay
Samsung Pay
Samsung Pay
Stripe
Stripe
Square
Square
Klarna
Klarna
Afterpay
Afterpay
Affirm
Affirm
iDEAL
iDEAL
Maestro
Maestro
Bancontact
Bancontact
Giropay
Giropay
SOFORT
SOFORT
Alipay
Alipay
WeChat Pay
WeChat Pay
Trustly
Trustly
Interac
Interac
Verifone
Verifone
Worldpay
Worldpay
Payoneer
Payoneer
Skrill
Skrill
Neteller
Neteller
PaysafeCard
PaysafeCard
Wise
Wise
Razorpay
Razorpay
PayU
PayU
Braintree
Braintree
BlueSnap
BlueSnap
Adyen
Adyen
Authorize.Net
Authorize.Net
Mollie
Mollie
Zip
Zip
ELO
ELO
Humm
Humm
Poli
Poli
Sezzle
Sezzle
PagSeguro
PagSeguro
MercadoPago
MercadoPago
Paytm
Paytm
BharatQR
BharatQR
GCash
GCash
GrabPay
GrabPay
Line Pay
Line Pay
OXXO
OXXO
Paysera
Paysera
Zelle
Zelle
We Accept:
Zatím žádné hodnoceníPodělte se o své myšlenky. Napište první hodnocení.
V tomto jazyce nebyly zatím zveřejněny žádné příspěvky
Až budou příspěvky zveřejněny, uvidíte je zde.
Details
Reviews
Similar Items

Související produkty

Nejprodávanější

Popular Pick
Viewed item

Computer Accessories

Follow us @ 

  • Instagram
  • Youtube
  • Facebook
  • Pintest
  • TikTok
  • X

Stronics Limited, registered office: 12 Harlesden gardens, London NW10 4EX. Registered in England, no. 12713943

©2020-2026 by Stronics. All right reserved.

bottom of page